43 Orealla Cres Sunrise Beach QLD 4567

Description
Demolition Class 1 and 10
Planning Authority
Noosa Shire Council
Reference number
DBW24/0101
Date sourced
We found this application on the planning authority's website on , about 2 months ago. It was received by them earlier.
Notified
193 people were notified of this application via Planning Alerts email alerts
Comments
3 comments made here on Planning Alerts
on the Noosa Shire Council website

Save this search as an email alert?

Create an account or sign in.

It only takes a moment.

Public comments on this application

3

Comments made here were sent to Noosa Shire Council. Add your own comment.

Re DBW24/0101

There is asbestos throughout the property including but not limited to super 6 buried in the backyard which is friable and used as a retaining wall. Asbestos removal needs to be done professionally and testing needs to occur in case there is soil contamination.

As the house was originally a cut and fill the main lower part of the house is a retaining wall which stops the land from slipping away from adjacent property. Earthworks and demolition works need to consider this and mitigate any loss that may occur. A degradation report must be carried out on neighbouring properties to ensure damage or loss does not occur.

The neighbourhood is aware of the issues in relation to this property.

Liability rests on the council if they approve this application without mitigating the above issues.

Hamish Mickle
Delivered to Noosa Shire Council

I inspected this property in some detail when it was up for sale. Whilst I have no objection to demolition and/or re-development of the property, I observed that there is asbestos throughout the property and in particular "Super 6" buried in the back garden (used as a retaining wall), which is friable. I am most concerned that asbestos removal needs to be done professionally and testing needs to take place to ensure that there is no soil contamination.
I believe that the house was originally a "cut and fill" arrangement to stop the land from slipping away from adjacent property. As such earthworks and demolition need to consider this and mitigate for any loss that may occur. A degradation report must be carried out on the neighbouring properties to ensure damage or loss does not occur. If the above issues were not mitigated, then liability would rest with the council should they approve this application.

James Nigel Pearson
Delivered to Noosa Shire Council

Need to ensure asbestos removal is done absolutely safely by certified professionals. Then soil samples need to confirm area is cleansed of contamination for the welfare of surrounding residents.