Drawing no. LDA-02 01 confirms the existing Lilly Pilly hedge to the SW boundary of the site is to be retained. This is supported. Drawing no. LDA-01 01 shows a new treated pine retaining wall (~1-1.5m high) to be constructed adjacent to the hedge. What measures will be in place to ensure that site clearance, and construction of the wall and the temporary drainage can be carried out without affecting the hedge?
Conversion of this single dwelling to a dual dwelling lot does not appear to be in line with the Church Point LEP and DCP.